MIL-DTL-8794F
TABLE VI. Qualification test sequence.
Hose or hose
Hose assembly
Test sequence
assembly
type
number
N/A
Strip specimen
N/A
N/A
4.8.1 1/
Inner tube
N/A
4.8.1 1/
1 and 2
Hose
3 through 9
10
11
12 and 13
14 and 22
Hose assembly
23 through 15
16
17
18
19
1/ Visual inspection, see 3.3.1.
4.5.3 Acceptance of qualification inspection data. Required qualification tests at the hose assembly
level that were already performed at the bulk hose level may be waived if documented approval has been
obtained from the qualifying activity.
4.5.4. Failures. One or more failures shall be cause for refusal to grant qualification.
4.5.5 Test plans and qualification reports.
4.5.5.1 Test plans. Test plans shall be prepared and submitted in accordance with the requirements
of the qualification activity. The method of qualification proposed by the contractor is subject to the
approval of the qualification activity. Manufacturers shall discuss with the qualifying activity the test
specimens and test plans. These plans shall state specifically the component requirement to be verified
during the test, such as test fixtures, setup, conditions, and identification of the successor failure criteria
shall be included as appropriate.
4.5.5.2 Qualification reports. Qualification reports shall be submitted in accordance with
requirements of the qualifying activity. The visual and mechanical inspection and the hose assembly
fitting inspection will be 100% unless another sampling plan is approved in writing by the qualifying
activity.
4.6 Conformance inspection.
4.6.1 Individual inspection. Individual inspection shall consist of the inspections specified in table
VII in the order shown.