MIL-DTL-27267D
4.5 Conformance inspection.
4.5.1 Individual tests. Inspection of the product for delivery shall consist of subjecting each hose
length to the individual tests specified in table IX. Any item failing to meet the requirements of the
individual tests shall be immediately removed from the lot.
TABLE IX. Individual inspection.
Requirement
Test method
Requirement
paragraph
Paragraph
---
Examination of product
Proof pressure
4.5.2 Sampling tests. The following inspections and tests shall be performed in the order indicated
on two samples, one consisting of eight hose assemblies with straight fittings at each end and the
second consisting of 4 lengths of hose, selected at random from each inspection lot. The inspection lot
shall consist of approximately, but not more than, 3000 hose assemblies, all of one size manufactured
under essentially the same conditions, but not necessarily during one continuous run. One hose
assembly tested from each lot of 375 hose assemblies is also permitted. The first sample (8 hose
assemblies) shall be subjected to tests in the following sequence.
The second sample (4 hose lengths) shall be subjected to tests in the following sequence:
NOTE: Production lot records may be used to verify conformance to specific gravity tests if the
PTFE tube being used is an established production item.
4.5.2.1 Nonconformance of sampling tests. If one or more defects are found in the inspection
sample, both the qualifying and inspection activities shall be immediately notified and the production lot
shall be rejected and not be supplied to this specification. Acceptance and shipment of the product shall
be discontinued until corrective action, acceptable to the qualifying activity, has been taken. The
corrective measures shall be performed on the materials or processes, or both, as warranted, and on all
products considered subjected to the same failure. Once the corrective action has been completed,
either the specific sampling test in which the original sample failed or all sampling tests may be required
to be repeated on additional samples, at the option of the qualifying activity. However, final acceptance
shall be withheld until testing has shown that the corrective action was successful. In the event of a
failure after re-inspection, information concerning the failure and the corrective action taken shall be
furnished to both the qualifying and inspection activities.
4.5.3 Periodic Control Tests. The following inspections and tests shall be performed as indicated on
eight hose assemblies manufactured from bulk hose lengths selected at random from each inspection lot.
The inspection lot shall consist of not more than 20,000 feet of hose, all of one size, manufactured under
essentially the same conditions but not necessarily during one continuous run. Two hose assemblies
manufactured and tested from each lot of 5000 feet of hose is also permitted.
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business