MIL-DTL-27267D
4.4.3.1 Acceptance of qualification data. For identical requirements and test procedures, using an
identical fitting, qualification test data from the manufacturer of MIL-DTL-27267 hose shall be accepted
as qualification test data for MIL-DTL-27272 and for MIL-DTL-25579 providing that documented approval
has been obtained from the qualifying activity. Unless otherwise approved by the qualifying activity,
qualification test data from one manufacturer shall not be accepted for another manufacturer of the same
product.
4.4.4 Failures. One or more failures shall be cause for refusal to grant qualification approval.
4.4.5 Retention of qualification. To retain qualification, the manufacturer shall submit a report at
12-month intervals to the qualifying activity. The qualifying activity shall establish the initial reporting date.
Each report shall contain a summary of the results obtained from both the sampling tests and the periodic
control tests performed during the 12-month interval. The number of lots and the quantities of assemblies
that have passed and failed shall be included. All reworked lots shall also be accounted for and
identified.
4.4.5.1 Nonconformance of qualification. If the summary of test results indicates nonconformance
with the requirements specified herein but corrective measures acceptable to the qualifying activity have
not been taken, action may be taken to remove the failing product from the QPL.
4.4.5.2 Periodic qualification report. Failure to submit the report within 30 days after the end of each
12-month period may result in loss of qualification for the product. In addition to the periodic submission
of inspection data, the manufacturer shall immediately notify the qualifying activity at any time during the
12-month period that the inspection data indicates failure of the qualified product to meet the requirement
specified herein. Testing shall be in accordance with the procurement standard. No sampling or periodic
testing is required for a specific size if there has been no production for that size in the reporting period. If
there has been no production for a period of three years or longer at any location, sampling tests (two
items for each sampling test) shall be completed with items from the first production lot when production
is resumed for the applicable size at the applicable location.
4.4.5.3 Sampling and periodic tests- limited production. In the case where there has been limited
production, and the specification limit for the applicable sampling or periodic control tests has not been
reached within a three year period since the last sampling or periodic test, the required sampling or
periodic control tests shall be performed using the small lot test sample quantities as specified in the
procurement specification within 30 calendar days of the end of the three year period.