MIL-DTL-17505F
4.7.18.2 Flexibility. The helix wire or wires shall be wrapped six full tight turns around a mandrel
of a diameter three times the diameter of the wire. The wrapped wire shall show no defects in the
steel after wrapping. Flaking or peeling of wire coating shall not be considered a defect.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the
contract or order (see 6.2). When actual packaging of materiel is to be performed by DoD
personnel, these personnel need to contact the responsible packaging activity to ascertain requisite
packaging requirements. Packaging requirements are maintained by the Inventory Control Point's
packaging activity within the Military Department or Defense Agency, or within the Military
Department's System Command. Packaging data retrieval is available from the managing Military
Department's or Defense Agency's automated packaging files, CD-ROM products, or by
contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which is helpful, but is not
mandatory.)
6.1 Intended use. Hose and hose assembly are intended for use in the transfer of oil and gasoline
from anchored tankers and barges to shore stations capable of handling discharge pressures up to
150 psi (1 034 kilopascal (kPa)).
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification.
b. Size and length of hose required (see 1.2 and 3.3).
c. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2 and 2.3).
d. When first article is required for inspection and approval (see 3.1 and 4.2).
e. Whether end connections different from those specified herein are required (see 3.4.4.1).
f. Whether bronze or integral flanged aluminum alloy nipples and flanges are to be used
(see 3.4.6).
g. Packaging requirements (see 5.1).
6.3 First article. When a first article inspection is required, the item will be tested and should be a
first production item or it may be a standard production item from the contractor's current
inventory as specified in 4.2. The first article should consist of one hose or hose assembly. The
contracting officer should include specific instructions in acquisition documents regarding
arrangements for examination, test, and approval of the first article.
6.4 Part or Identifying Numbers (PINs). The specification number and size are combined to form
PINs for hose and hose assembly covered by this document (see 1.2). PINs for the hose and hose
assembly are established as follows:
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business