MIL-PRF-370J
TABLE VI. FAT application and test methods - Continued.
Hose type
Requirement
Test
Test description
Test
ABCD
Paragraph Paragraph
104
X X X X Tensile strength, original (tube and
3.3.6,
4.3.6.1
Table III
cover)
105
X X X X Tensile strength after fuel immersion
3.3.6,
4.3.6.2
Table III
106
X
Tensile strength after water
3.3.6,
4.3.6.2.1
Table III
immersion (14 days)
107
X
Tensile strength after water
3.3.6,
4.3.6.2.1
immersion (42 days)
Table III
108
XX
X Ultimate elongation, original
3.3.6,
4.3.6.1
Table III
109
X X X X Ultimate elongation after fuel
3.3.6,
4.3.6.2
immersion
Table III
110
X
Ultimate elongation after water
3.3.6,
4.3.6.2.1
immersion (14 days)
Table III
111
X
Ultimate elongation after water
3.3.6,
4.3.6.2.1
immersion (42 days)
Table III
112
X X X X Volume increase after fuel immersion
3.3.6,
4.3.6.2
(tube and cover)
Table III
113
X X X X Adhesion (between reinforcement and
3.3.6,
4.3.6.3.1
tube), original
Table III
114
X X X X Adhesion (between reinforcement and
3.3.6,
4.3.6.3.1
cover), original
Table III
115
XX
X Adhesion (tube/reinforcement), after
3.3.6,
4.3.6.3.2
immersion in fuel
Table III
116
XX
X Adhesion (cover/reinforcement), after
3.3.6,
4.3.6.3.2
immersion in fuel
Table III
117
X
Adhesion (tube/reinforcement), after
3.3.6,
4.3.6.3.3
Table III
fuel fill test
118
X
Adhesion (cover/reinforcement), after
3.3.6,
4.3.6.3.3
fuel fill test
Table III
119
XX
Low temperature flexibility
3.3.6,
4.3.6.4.1
Table III
120
X
Torsional rotation
3.3.6,
4.3.6.4.2
Table III
121
X Brittleness
3.3.6,
4.3.6.4.3
Table III
122
X Modulus of elasticity (tube and cover)
3.3.6,
4.3.6.4.4
Table III
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business