MIL-PRF-11588H
The existent gum on the blank fluid shall be subtracted from the existent gum obtained from the
test fluid removed from the hose. Nonconformance shall constitute failure of the test.
4.5.10 Continuity. Electrical continuity shall be tested for by means of an ohmmeter.
Three sections of finished hose shall be coupled together and checked for electrical continuity for
first article tests. One section of finished hose shall be used for sample test. Nonconformance to
3.5.10 shall constitute failure of this test. Test shall be conducted with hose length laid out flat
on a non-conducting surface.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When actual packaging of material is to be performed
by DoD personnel, these personnel need to contact the responsible packaging activity to ascertain
requisite packaging requirements. Packaging requirements are maintained by the Inventory
Control Point's packaging activity within the Military Department or Defense Agency, or within
the Military Department's System Command. Packaging data retrieval is available from the
managing Military Department s or Defense Agency s automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which may be
helpful, but is not mandatory.)
6.1 Intended use. The hose assemblies covered by this specification are intended for use
in connection with dispensing liquid petroleum fuels as follows:
Type I
-
Primarily for use with gasoline dispensing pumps.
Type II -
Primarily for use in fuel trailers and carts.
Type III -
Primarily for use with Marine Corps amphibious assault fuel handing
systems capable of handling light petroleum fuels.
Type IV -
Primarily for use with air craft refuelers.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification.
b. Type, class, size, and style of hose assembly required (see 1.2).
c. Issue of DoDISS to be cited in the solicitation and, if required, the specific
issue of individual documents referenced (see 2.2.1 and 2.3).
d. When a first article is not required (see 3.1).
e. Length of hose required (see 3.3.1).
f. When the color of the hose is not black (see 3.3.1).
g. When the PIN number will be branded on the length of hose (see 3.5.11).
h. Packaging requirements (see 5.1).
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business