MIL-PRF-26385G
4.2 First article inspection. First article inspection shall be performed on two 12-inch length
hoses and shall consist of all tests in section 4.6.
4.3 Conformance inspection. Conformance inspection shall consist of the individual tests in
4.3.1 and the sampling tests in 4.3.2.
4.3.1 Individual tests. Each hose shall be subjected to the following tests:
a. Examination (see 4.6.1).
b. Leakage (see 4.6.2).
c. Delamination (see 4.6.3).
4.3.2 Sampling tests. Sampling tests shall be performed in accordance with the guidance in
ASQ Z1.4. Sampling shall begin at the normal inspection level (see 6.7). The sampling tests are:
a.
Cleanliness (see 4.6.4).
b.
Flexibility (see 4.6.5).
c.
Elongation (see 4.6.6).
d.
Static load (see 4.6.7).
e.
Odor (see 4.6.10).
4.4 Test conditions. Unless otherwise specified herein, all tests shall be performed under the
following test conditions:
a. Ambient atmospheric conditions.
b. Oxygen conforming to Type I of MIL-PRF-27210.
4.5 Requirements cross-reference matrix. Table I provides a cross-reference matrix of the
section 3 requirements tested or verified in the paragraphs below.
TABLE I. Requirements cross-reference matrix
Requirement
Verification
Requirement
Verification
3.1
4.2
3.5.5
4.6.5, 4.6.8
3.3
4.6.1
3.5.6
4.6.6
3.3.1
4.6.13
3.5.7
4.6.7
3.4.1
4.6.1
3.5.8
4.6.8
3.4.2
4.6.1, 4.6.2
3.5.9
4.6.9
3.4.3
4.6.1
3.5.10
4.6.10
3.5.1.1
4.6.5, 4.6.6, 4.6.7
3.5.11
4.6.11
3.5.1.2
4.6.1, 4.6.3
3.5.12
4.6.12
3.5.1.3
4.6.1
3.5.13
4.6.14
3.5.1.4
4.6.1
3.5.14
4.6.1
3.5.2
4.6.2
3.5.15
4.6.1
3.5.3
4.6.3
3.6
4.6.1
3.5.4
4.6.4
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business